The big hole is patched and levelled.
Showing posts with label main line replacement. Show all posts
Showing posts with label main line replacement. Show all posts
Monday, June 14, 2010
Sunday funday!
Week 4 of the garden! More soaker hose added and installed.

The big hole is patched and levelled.
The bricks are stacked, the rocks are piled & the concrete pieces are removed from the weed garden edges.
And the patio is still mostly useable. Compare to pics yesterday. There are only 93 stones removed. Great work out removing dirt from bricks and stacking them. Im sure Ill feel it today.
The big hole is patched and levelled.
Labels:
cinder blocks,
garden,
main line replacement,
patio
Sunday, June 13, 2010
Long awaited sunny Saturday
Travis prepped the area we expected to run the main line thru. Protecting the tomatos and peppers... but in the end that wasnt how it worked out...

Anyone that was looking forward to mud wrestling on the patio, I apologize--you missed your chance! The water is gone, for good I hope! The mainline actually ran in to the house about 4ft to the left of where we expected.

What a mess! I just wanted to run around sweeping and arranging things.

What a gnarly machine. Trench digger in action.

Utter destruction and chaos.

For the price of this job I decided it was ok if I did nothing and just took pictures (Travis probably doesnt approve this comment) Look at all these muscles! How could I NOT?
Anyone that was looking forward to mud wrestling on the patio, I apologize--you missed your chance! The water is gone, for good I hope! The mainline actually ran in to the house about 4ft to the left of where we expected.
What a mess! I just wanted to run around sweeping and arranging things.
What a gnarly machine. Trench digger in action.
Utter destruction and chaos.
For the price of this job I decided it was ok if I did nothing and just took pictures (Travis probably doesnt approve this comment) Look at all these muscles! How could I NOT?
Subscribe to:
Posts (Atom)